| ..:: CALL ME::.. |
![]() |
Vol. 6 No. 2 (2026): June-August 2026
##plugins.themes.liteScholar.issue.totalArticles## | ##plugins.themes.liteScholar.issue.totalPages##
##plugins.themes.liteScholar.issue.coverage##
##plugins.themes.liteScholar.issue.foreign##
Indonesia (74)
Japan (1)
Articles
-
Design and Feasibility Evaluation of the TAPTAP Digital Platform for Measuring Port Service User Satisfaction at KSOP Bontang
Herdandy Octabrilian Putra, Rizqi Aini Rakhman, Sri Mulyanto Herlambang, Trisnowati RahayuShow Abstract | Download PDF | DOI: 10.31004/jestm.v6i2.417 | Check in Google Scholar
This study designs and evaluates the feasibility of the TAPTAP digital platform, a Figma-based prototype for measuring port service user satisfaction at the Bontang Harbormaster and Port Authority Office (KSOP Bontang). The study used a Research and Development (R&D) approach adapted into six stages: problem identification, information collection, product design, design validation, design revision, and product trial. Data were gathered through field observation, document review, stakeholder input, and expert feasibility assessment. Two expert testers, consisting of a marine transportation lecturer and an information technology expert, assessed the prototype using a feasibility instrument covering button functionality, initial menu display, completeness and readability of satisfaction questions, presentation of satisfaction results, and overall feature functionality. TAPTAP provides public-side features for satisfaction surveys, complaints, and aspirations, as well as officer-side features for report monitoring and satisfaction-data visualization. The feasibility test produced scores of 80% from Tester 1 and 85.33% from Tester 2, indicating that the prototype is feasible for further pilot testing. The results show that TAPTAP can support more structured service feedback management at KSOP Bontang, although broader public-user testing, database implementation, data security validation, and integration with KSOP systems are still required before operational deployment
387-400 -
Analysis of the Decrease in Compressed Air Production of the Air Compressor onboard MT Seroja III
Bayhaqi Putra, Nasri, Abdi Seno, Intan Sianturi, Rika FitrianiShow Abstract | Download PDF | DOI: 10.31004/jestm.v6i2.409 | Check in Google Scholar
The air compressor is an essential auxiliary machinery onboard MT Seroja III, playing a critical role in supporting vessel maneuverability, operational safety, and main engine starting readiness. During operations, a critical reduction in compressed air production was encountered, leading to prolonged air reservoir filling times and potential risks during ship maneuvering. This study aims to identify the root causes of decreased compressed air production in the main air compressor onboard MT Seroja III and to formulate corrective and preventive maintenance actions based on onboard observations and Fault Tree Analysis (FTA). This research employs a qualitative descriptive method, utilizing continuous monitoring parameter logs, field inspections, and semi-structured interviews with engine officers over a 12-month sea service period. The diagnostic findings using FTA indicate that the decrease in volumetric efficiency was primarily caused by high-resistance suction filter blockages, severe carbon fouling on suction and delivery valves, and piston ring degradation. Corrective maintenance involving filter purging, valve refacing, and piston ring replacement successfully restored the compressor discharge pressure to 30 bar and reduced the air receiver filling time from 45 minutes to 15 minutes. The study concludes that strict adherence to the vessel's Planned Maintenance System (PMS) is mandatory to guarantee operational safety and prevent compression loss.
438-443 -
Analysis of the Effectiveness of the Marine Growth Prevention System (MGPS) in Preventing Marine Organism Growth in the Engine Cooling System of MV Ever Clear
Brian Pratama Timur, Monika Retno Gunarti, Nasri, Intan Sianturi, Elly KusumawatiShow Abstract | Download PDF | DOI: 10.31004/jestm.v6i2.414 | Check in Google Scholar
The ship engine cooling system is critical for maintaining the operational stability of main and auxiliary machinery. However, biofouling within sea chests and seawater pipelines remains a prevalent issue, leading to flow obstruction, reduced heat transfer efficiency, and potential engine malfunction. While the Marine Growth Prevention System (MGPS) is designed to mitigate this via electrolysis, marine growth persisted on MV Ever Clear, indicating suboptimal system performance. This study aims to analyze the effectiveness of the MGPS in preventing biofouling and to identify factors contributing to its performance degradation. Using a qualitative descriptive method with a case study approach, data were collected through direct onboard observation, interviews with the engineering crew, and document analysis. Results indicate that the decreased effectiveness was primarily caused by insufficient electrode maintenance, unstable electrical parameters (current and voltage), and inadequate operational monitoring. These deficiencies compromised the electrolysis process, preventing sufficient ion release. It is concluded that MGPS efficacy is contingent upon stable electrical parameters, rigorous preventive maintenance, and consistent operational supervision in accordance with established procedures.
450-457 -
The Effectiveness of Emergency Drill to Prepare Crew to Face Abandoned Ships on MT. Pagerungan
Daffanda Yoda Wibisono, Elise Dwi Lestari, Elly Kusumawati, Upik WidyaningsihShow Abstract | Download PDF | DOI: 10.31004/jestm.v6i2.452 | Check in Google Scholar
Safety of life at sea is a paramount operational priority that heavily relies on crew preparedness in managing maritime emergencies. This study evaluates the effectiveness of abandon ship drills in improving crew readiness on the commercial tanker MT. Pagerungan. Using a qualitative case-study design, data were collected over a 12-month period through direct participant observations, structured interviews with six key personnel, and documentary analysis. Effectiveness was measured using specific operational indicators: alarm response time, correct usage of life-saving appliances (LSAs), compliance with muster list duties, and communication efficiency. The results indicate a significant gap between administrative compliance and practical readiness. Drills were conducted only four times annually, violating the monthly requirement stipulated by the Safety of Life at Sea (SOLAS) Convention. Observations revealed critical deficiencies, including the inability of junior and catering crew members to correctly don lifejackets and a lack of role awareness among specific deck ratings. Furthermore, commercial pressures and a tendency to view drills as bureaucratic formalities hindered the development of a robust safety culture. The study concludes that while incremental improvements were observed across repeated drills, overall effectiveness remains structurally fragile. Recommendations include the rigorous implementation of monthly drills, integration of pre-drill toolbox meetings, station-specific compliance checklists, and documented competency assessments to bridge the gap between regulatory mandates and actual emergency preparedness
464-471 -
Analysis of Lifeboat Maintenance to Support Crew Safety on Board MV. Aliyah Pratama in Accordance with SOLAS Chapter III
Navire Tsabitah Lamaya, Damoyanto Purba, Elly Kusumawati, I'ie SuwondoShow Abstract | Download PDF | DOI: 10.31004/jestm.v6i2.456 | Check in Google Scholar
Non-compliance in the execution of lifeboat maintenance procedures significantly heightens operational risks and impairs evacuation effectiveness during maritime emergencies. This study evaluates the conformity of lifeboat maintenance and operational readiness on board the bulk carrier MV. Aliyah Pratama against the specific requirements of the Safety of Life at Sea (SOLAS) Chapter III Regulation 20 and the Life-Saving Appliances (LSA) Code. Utilizing a qualitative descriptive case study approach, data were collected over a 12-month period at Cilegon Anchorage through direct field observations, structured interviews with three key deck officers, and systematic reviews of the ship’s Planned Maintenance System (PMS) documentation. A compliance matrix was developed to benchmark observed mechanical and operational conditions against regulatory standards. The findings reveal critical discrepancies, including mechanical stiffness in the starboard gear brake, active corrosion on wire falls and winches, hardened watertight door seals, and expired emergency rations. Furthermore, abandon-ship drills demonstrated a lack of situational awareness and muster list comprehension among the crew. Root cause analysis, structured via the Ishikawa (Fishbone) framework, indicates that these non-conformities stem from superficial, visually limited inspections, high operational workloads, an aggressive saline environment, and shore-based procurement delays. The study concludes that the vessel's current maintenance execution functions primarily as an administrative formality rather than a rigorous functional safeguard. Corrective recommendations prioritize the implementation of deep-technical functional testing, expedited supply-chain logistics for safety equipment, and mandatory pre-drill tactical briefings to restore optimal evacuation.
472-478 -
Implementation of a Decision Support System Using the Simple Additive Weighting (SAW) Method in the New Student Admission Selection Process
Maya Oktarina, Nazori Suhandi, Indah PermatasariShow Abstract | Download PDF | DOI: 10.31004/jestm.v6i2.385 | Check in Google Scholar
The selection process for new student admissions in secondary schools is often manual and error-prone, so a web-based decision support system (DSS) is needed to improve objectivity and efficiency. This study aims to design and implement a DSS using the Simple Additive Weighting (SAW) method at SMK Negeri 1 Tanjung Lubuk. An applied quantitative approach with the Waterfall model was used; the population was all prospective students through three admission pathways, a sample of 23 purposive applicants. Instruments included academic data documents, interviews, and web input; data analysis via SAW (matrix normalization, criteria weighting, preference values). The results showed an accurate ranking with the highest score of 1.84 (Muhamad Angga Prayitno) based on five criteria (exam scores, report cards, KIP, achievement, distance). The conclusion states that the system increases transparency and speed of selection, and replication in other schools with broader testing is recommended.
476-487 -
Proper Use of Mooring Lines on Ships to Ensure a Smooth Berthing Process on The MT. Giat Armada 04
Bima Surya Pulung Sakti, Elise Dwi Lestari, Elly Kusumawati, Upik WidyaningsihShow Abstract | Download PDF | DOI: 10.31004/jestm.v6i2.463 | Check in Google Scholar
This study aims to analyze the influence of the physical condition of mooring lines and supporting mooring components on the smooth berthing process of MT. GIAT ARMADA BERSAMA 04. The berthing process is a critical operational phase requiring a highly reliable mooring system to ensure the safety of the vessel, cargo, crew, and port facilities. Employing a qualitative descriptive method, data were collected through field observations across 12 berthing operations, structured interviews with deck officers, and document analysis. The findings revealed that the physical deterioration of the spring lines—specifically characterized by a visible diameter reduction, bird-caging, and surface abrasion exceeding the 10% broken strand threshold—contributed to severe operational difficulties. Furthermore, corroded deck fittings increased mechanical friction, leading to ropes jamming in the mooring chocks and significant delays in tension adjustment. Evaluated against the retirement criteria and inspection parameters defined by the OCIMF Mooring Equipment Guidelines (MEG4) and IMO safety mandates, the vessel’s mooring components operated below acceptable minimum breaking load (MBL) safety margins. Immediate replacement of degraded lines and the implementation of a strict Line Management Plan (LMP) are imperative to restore operational precision, mitigate occupational hazards, and enhance overall port efficiency.
499-504







